Selected work

Programmes delivered across the group.

Clients are described by sector and area rather than by name. Named references, certificates and programme reports are available on request for procurement.

Row of red brick terraced homes in South Manchester
Social housing, South Manchester

EICRs and remedial works across 412 homes, with tenants in place throughout.

A planned programme for a housing association, booked around residents and certificated to one standard across every property. Delivered by Mister Electrics.

Homes certificated
412
Weeks on programme
16
Tenants moved out
0
Interior of a modern dessert parlour with seating and feature lighting
Hospitality, multi-site

LED lighting upgrades and periodic testing across 18 dessert parlours for a national franchise.

Delivered overnight across the North West, Yorkshire and the Midlands, so no parlour lost a trading hour. Delivered by Mister Electrics.

Parlours
18
Regions
3
Trading hours lost
0
Apartment blocks in Manchester city centre
Block management, Praetor

Twelve blocks and four suppliers brought onto one contract

Brief. Consolidate fire alarm, emergency lighting, extinguisher and door entry contracts across a managed portfolio.

What we did. Every block surveyed, logbooks reviewed and overdue items flagged, then all systems brought onto one servicing schedule.

Handed over. One contract, one renewal date and a certificate pack per block.

Blocks in 3 weeks
12
Defects closed
27
Care home lounge with a walking frame beside a window chair
Care home in Stockport, Praetor

Fire panel replaced in a 42-bed care home without losing detection

Brief. Replace an ageing fire alarm panel in an occupied care home with no loss of protection for residents.

What we did. Panel swap phased over four night shifts with temporary detection and a fire watch plan agreed with the home manager.

Handed over. Commissioning certificate, updated zone plan and logbook.

Night shifts
4
Hours without detection
0
Fire alarm control panel wiring during an inspection
Warehouse in Trafford Park, Praetor

Insurer deadline met for an 85,000 sq ft warehouse

Brief. Complete fire detection and emergency lighting works required by the insurer within 90 days.

What we did. Insurer survey turned into a dated programme, works delivered around shifts with weekly progress reports.

Handed over. Certificates issued to the insurer with 14 days to spare.

Day deadline
90
Days to spare
14
Consumer unit after EICR remedial work in a rented terrace
Rental in Salford, Mister Electrics

Unsatisfactory EICR put right well inside the 28 days

Brief. A landlord's EICR came back unsatisfactory with four C2 observations and a 28 day deadline.

What we did. Each observation priced as a fixed line item, approved the same day and put right on one visit.

Handed over. A satisfactory report and written confirmation of the remedial work for the tenant and the council.

C2 codes cleared
4
Days to satisfactory
9