Electrical, fire and security across Greater Manchester and Cheshire EastCall 0161 710 4124 · Emergencies 24/7 07703 295654

Our work

Real work across the group.

Dessert bar fit-outs, care homes, rewires, night callouts and fire safety across Greater Manchester, delivered by the four companies in the group. Every photo and clip on this page is from our own jobs.

Specialist companies
4
Five-star Google reviews
370+
NAPIT member
75762
Response desk
24/7

Featured: Cheat Daze

Cheat Daze Oldham dessert bar finished: suspended LED lighting over the red counter, black tiles and neon signs
Commercial fit-out, Cheat Daze, Wired & Certified

Cheat Daze dessert bars, wired from bare unit to opening day.

The full electrical package for a busy dessert bar: a new consumer unit, dedicated circuits for commercial ovens and ice cream machines, sockets, suspended LED lighting, LED strip and the neon signs. Wired & Certified works across all Cheat Daze sites. See the full fit-out (opens in a new tab)

Sites
All
Contractors needed
1
Certified to
BS 7671
Suspended linear LED lights over the black ceiling at Cheat Daze, with the red counter below
Cheat Daze Salford: the illuminated counter, LED strip and menu screens
LED strip lighting the edges of the tiled feature wall at Cheat Daze

Real jobs, no stock photos

Filmed and photographed by our own electricians.

From a dessert bar fit-out to a consumer unit wired by head torch at night.

Projects

More projects across the group.

Cheat Daze is named. Other clients are described by sector and area; references, certificates and programme reports are available on request.

Care home lounge with a walking frame beside a window chair
Care homes, Greater Manchester, Wired & Certified

Care homes fitted out and looked after, from rewires to every commercial circuit

We are fitting out and supporting a care home across its sites in Greater Manchester: full rewires through to all of the commercial electrical work, planned around the residents and staff so care carries on while we work. Wired & Certified leads the electrical work.

Care sites across GM
Several
Through to commercial work
Rewires
Row of red brick terraced homes in Manchester
Social housing, Greater Manchester

EICRs and remedial works for a housing association, with tenants in place throughout

A planned programme for a housing association, booked around residents and certificated to one standard across every property. Delivered by Wired & Certified.

Tenants in place throughout
Occupied
EICRs and remedials
Planned
Apartment blocks in Manchester city centre
Block management, Praetor

Twelve blocks and four suppliers brought onto one contract

Brief. Consolidate fire alarm, emergency lighting, extinguisher and door entry contracts across a managed portfolio.

What we did. Every block surveyed, logbooks reviewed and overdue items flagged, then all systems brought onto one servicing schedule.

Handed over. One contract, one renewal date and a certificate pack per block.

Blocks in 3 weeks
12
Defects closed
27
Fire alarm panel and its supply board inside the plant cupboard
Care home in Stockport, Praetor

Fire panel replaced in a 42-bed care home without losing detection

Brief. Replace an ageing fire alarm panel in an occupied care home with no loss of protection for residents.

What we did. Panel swap phased over four night shifts with temporary detection and a fire watch plan agreed with the home manager.

Handed over. Commissioning certificate, updated zone plan and logbook.

Night shifts
4
Hours without detection
0
Fire alarm control panel wiring during an inspection
Warehouse in Trafford Park, Praetor

Insurer deadline met for an 85,000 sq ft warehouse

Brief. Complete fire detection and emergency lighting works required by the insurer within 90 days.

What we did. Insurer survey turned into a dated programme, works delivered around shifts with weekly progress reports.

Handed over. Certificates issued to the insurer with 14 days to spare.

Day deadline
90
Days to spare
14
Consumer unit after EICR remedial work in a rented terrace
Rental in Salford, Wired & Certified

Unsatisfactory EICR put right well inside the 28 days

Brief. A landlord's EICR came back unsatisfactory with four C2 observations and a 28 day deadline.

What we did. Each observation priced as a fixed line item, approved the same day and put right on one visit.

Handed over. A satisfactory report and written confirmation of the remedial work for the tenant and the council.

C2 codes cleared
4
Days to satisfactory
9