Industrial and logistics

Industrial electrical and fire work, delivered around your shifts.

Distribution boards, sub-mains, lighting, fire detection and insurer-driven remedials for warehouses, trade units and industrial estates, planned around operating hours and your insurer's deadline.

Fire alarm control panel wiring during an inspection

What we do

What we do for industrial and logistics.

01

Insurer deadlines met

Survey reports and insurer requirements turned into a dated programme, with progress reported weekly until sign-off.

02

Distribution and sub-mains

New and replacement distribution boards, sub-mains and three-phase supplies, fitted out of hours where needed.

03

Fire detection

Design, installation and servicing of fire detection systems to BS 5839-1, sized for large open spaces.

04

Lighting upgrades

High-bay LED and emergency lighting upgrades that cut energy use and meet BS 5266-1.

05

Periodic testing

EICRs scheduled around shifts, with remedials prioritised by risk.

06

Security

CCTV and access control for yards, gates and loading bays, maintained by Praetor.

The rules

The duties that usually apply.

A summary, not legal advice. Your insurer or risk assessment may set stricter intervals, which we work to. Read our compliance guides.

  • Periodic inspection and testing of the installation, often every three to five years for industrial premises depending on use
  • Fire alarm servicing at least every six months (BS 5839-1)
  • Emergency lighting monthly and annual tests (BS 5266-1)

Delivered by

The companies that do this work.

Case study

Recent work in this sector.

Fire alarm control panel wiring during an inspection
Warehouse in Trafford Park, Praetor

Insurer deadline met for an 85,000 sq ft warehouse

Brief. Complete fire detection and emergency lighting works required by the insurer within 90 days.

What we did. Insurer survey turned into a dated programme, works delivered around shifts with weekly progress reports.

Handed over. Certificates issued to the insurer with 14 days to spare.

Day deadline
90
Days to spare
14
More case studiesProgrammes delivered across the group, described by sector and area. Named references on request.All case studies

Questions

Industrial and logistics: common questions.

Can you work to an insurer's deadline?

Yes. We turn the insurer's survey into a dated programme and report progress weekly. For an 85,000 sq ft warehouse in Trafford Park, a 90 day insurer deadline was met with 14 days to spare.

Do you work out of hours?

Yes. Shutdown work, board changes and anything that affects production can be scheduled for nights, weekends or planned shutdowns.

Do you issue RAMS?

RAMS are issued before first attendance on every commercial site, along with engineer details for your induction process.